The cockpit of a grounded Lion Air Boeing Co. 737 Max 8 aircraft. (Bloomberg photo by Dimas Ardian)

Boeing cutting production rate of troubled 737 Max jet

Boeing faces a growing number of lawsuits filed by families of the victims

Boeing will cut production of its troubled 737 Max airliner this month, underscoring the growing financial risk it faces the longer that its bestselling plane remains grounded after two deadly crashes.

The company said Friday that starting in mid-April it will cut production of the plane to 42 from 52 planes per month so it can focus its attention on fixing the flight-control software that has been implicated in the crashes.

The move was not a complete surprise. Boeing had already suspended deliveries of the Max last month after regulators around the world grounded the jet.

Preliminary reports into accidents in Indonesia and Ethiopia found that faulty sensor readings erroneously triggered an anti-stall system that pushed the plane’s nose down. Pilots of each plane struggled in vain to regain control over the automated system.

In all, 346 people died in the crashes. Boeing faces a growing number of lawsuits filed by families of the victims.

Boeing also announced it is creating a special board committee to review airplane design and development.

READ MORE: Canada bans Boeing 737 Max 8 plane following fatal Ethiopian crash

The announcement to cut production comes after Boeing acknowledged that a second software issue has emerged that needs fixing on the Max — a discovery that explained why the aircraft maker had pushed back its ambitious schedule for getting the planes back in the air.

A Boeing spokesman called it a “relatively minor issue” and said the plane maker already has a fix in the works. He said the latest issue is not part of flight-control software called MCAS that Boeing has been working to upgrade since the first crash.

Chairman and CEO Dennis Muilenburg described the production cut as temporary and a response to the suspension of Max deliveries.

Boeing has delivered fewer than 400 Max jets but has a backlog of more than 4,600 unfilled orders. The Chicago-based company had hoped to expand Max production this year to 57 planes a month.

Indonesia’s Garuda Airlines has said it will cancel an order for 49 Max jets. Other airlines, including Lion Air, whose Max 8 crashed off the coast of Indonesia on Oct. 29, have raised the possibility of cancelling.

A Boeing official said Friday’s announcement about cutting production was not due to potential cancellations. The official spoke on condition of anonymity because Boeing does not publicly discuss those details.

In a statement, Muilenburg said the reduction was designed to keep a healthy production system and maintain current employment — in effect, slowing down production now to avoid a deeper cut later, if fixing the plane takes longer than expected.

Analysts say the absence of deliveries will eat into Boeing’s cash flow because it gets most of the cost of a plane upon delivery.

Boeing declined to provide figures, but undelivered Max jets have been stacking up at its Renton, Washington, assembly plant.

Airlines that operate the Max will be squeezed the longer the planes are grounded, particularly if the interruption extends into the peak summer travel season.

They could buy used 737s, but that would be costly because the comparably sized Boeing 737-800 was very popular and in short supply even before the Max problems, according to Jim Williams, publisher of Airfax, a newsletter that tracks transactions involving commercial aircraft.

Williams said that if the Max grounding appears likely to extend into summer it will cause airlines to explore short-term leases, which could push lease rates higher, something that airline analysts say is already happening.

Boeing shares closed at $391.93, down $3.93. In after-hours after news of the production cut, they slipped another $8.98, or 2.3%, to $382.85.

David Koenig, The Associated Press

Like us on Facebook and follow us on Twitter.

Just Posted

New Seven Sisters replacement confirmed

Mental health facility will have 25 beds, up from 20 in current facility

Skeena Voices | The strums of euphony

Music teacher Geoffrey Parr will be retiring after 30 years at Caledonia Secondary School

Terrace hospital’s business plan approved

Health Minister’s announcement opens door to construction phase

Convicted animal abuser to return to B.C. court May 21

Catherine Jessica Adams is facing a breach of probation charge

Killer of Calgary mother, daughter gets no parole for 50 years

A jury found Edward Downey guilty last year in the deaths of Sara Baillie, 34, and five-year-old Taliyah Marsman

Raptors beat Bucks 120-102 to even series at 2-2

Lowry pours in 25 as Toronto moves within two games of NBA Finals

Body of missing snowmobiler recovered from Great Slave Lake

Police confirm the body is that of one of three missing snowmobilers

Toddler seriously injured after falling from Okanagan balcony

RCMP are investigating after a two-year-old boy fell from the balcony of an apartment in Kelowna

Cost jumps 35% for Trans-Canada Highway widening in B.C.

Revelstoke-area stretch first awarded under new union deal

Is vegan food a human right? Ontario firefighter battling B.C. blaze argues it is

Adam Knauff says he had to go hungry some days because there was no vegan food

Winds helping in battle against fire threatening northern Alberta town

Nearly 5,000 people have cleared out of High Level and nearby First Nation

B.C. sends 267 firefighters to help battle Alberta wildfires

Out of control fires have forced evacuations in the province

Most Read