Pipes intended for construction of the Keystone XL pipeline are shown in Gascoyne, N.D. on Wednesday April 22, 2015. TC Energy Corp. says it is going ahead with construction of its US$8-billion Keystone XL Pipeline project, with a helping hand from the Alberta government. THE CANADIAN PRESS/Alex Panetta

Pipes intended for construction of the Keystone XL pipeline are shown in Gascoyne, N.D. on Wednesday April 22, 2015. TC Energy Corp. says it is going ahead with construction of its US$8-billion Keystone XL Pipeline project, with a helping hand from the Alberta government. THE CANADIAN PRESS/Alex Panetta

With U.S. border work on track, rural Canadian towns fear an outbreak

Just south of the Canadian border, workers have begun arriving to work on the 1,200-mile Keystone pipeline

Major construction projects moving forward along the U.S. borders with Canada and Mexico are raising fears that the coronavirus could race through temporary camps and workers could spread it to nearby rural communities that would not be able to handle an outbreak.

Despite a clampdown on people’s movements in much of the country, groups of workers travel every day from camps in New Mexico to build President Donald Trump’s border wall.

Along the northern border, a Canadian company says it will start work this month on the disputed Keystone XL oil pipeline, which could bring thousands of workers to rural communities in Montana, South Dakota and Nebraska.

Residents, tribal leaders and state officials have warned that the influx of outsiders could make problems worse in rural areas with little or no medical infrastructure capable of dealing with a surge of infections. Both the border wall and pipeline are exempt from stay-at-home restrictions intended to reduce the spread of the virus.

Faith Spotted Eagle, an environmental activist and member of the Yankton Sioux Tribe in South Dakota, said she’s reminded of her grandmother’s stories about the tribe’s struggles to survive small pox and the Spanish flu.

“It’s the 1800s again, the cavalry is coming in and they’re going to set up their fort, whether it’s justified or not,” she said.

Cities have borne the brunt of the virus so far in the U.S., but rural areas are expected to be hit as well.

That’s a fear in tiny Columbus, New Mexico, where residents worry about the influx of border wall workers who often gather outside the town’s few restaurants while the rest of the community has been ordered to stay at home and keep their distance from others.

“My bottom line is nothing is worth thousands or hundreds or tens of people getting COVID,” said resident July McClure, who manages a local RV park and volunteers with the fire department.

In the town of less than 1,500 people, about 30 construction workers are setting up camp in tightly packed trailers, residents say. Others are staying at two small hotels while they put up bollard-style fencing along the scrub desert — a small piece of about 200 miles (320 kilometres) of barriers being built along the U.S.-Mexico border.

Adriana Zizumbo, 32, who operates a cafe, said she’s shocked to see dozens of people congregating when Columbus is on lockdown.

“It is kind of crazy because I thought they limited (gatherings) to five people or 10 people, and they’re setting up some man camps out in Columbus, and there’s about to be a lot of men in one (place),” Zizumbo said.

The U.S. Army Corps of Engineers, which oversees the contractors working on the southern border, said it follows guidelines from the Centers for Disease Control and Prevention but declined to share specifics on how it’s protecting public health during construction.

Just south of the Canadian border, workers have begun arriving in the small Montana town of Glasgow to work on the 1,200-mile (1,930-kilometre) Keystone pipeline this month, according to the company and the governor’s office. The new pipeline would tie into existing infrastructure at the Nebraska-Kansas line, where it would carry crude oil south to the Gulf of Mexico for possible export.

First proposed in 2008, the pipeline was stalled for years by legal challenges and rejected twice under President Barack Obama. Trump revived it by personally approving the line’s border crossing permit, and Alberta Premier Jason Kenney said Tuesday that the provincial government was investing more than $1 billion to get work going quickly.

READ MORE: Canadian firm starts U.S. prep work for Keystone XL pipeline

Calgary-based TC Energy, the project’s sponsor, said it’s collaborating with health officials in northern Montana to minimize risks, including checking everyone entering work sites for fever and ensuring workers follow social distancing guidelines. The company says more than 10,000 construction jobs would be created by the $8 billion project, with about 100 workers initially at the border crossing.

“We’re very cognizant of what’s going on,” spokesman Terry Cunha said. “We’re talking about thousands of jobs. … We want to make sure what they do will ensure the safety of everybody.”

The company had planned to build 11 camps for workers along the pipeline’s route — six in Montana, four in South Dakota and one in Nebraska, according a U.S. State Department review of the project. Those plans were being reviewed in light of the pandemic, but they will still be required eventually, Cunha said Wednesday.

The camps would be built on open land and house up to 1,000 people, according to the State Department review.

Several tribes whose land is skirted by the proposed pipeline route in South Dakota and Montana have enacted stricter measures than the state to protect tribal members from the coronavirus. Many tribal members worry what a widespread outbreak would do to a population already at risk for diabetes and high blood pressure.

Spotted Eagle said she did not believe any promised safety measures, such as quarantining workers or regular screenings, would be enough to keep communities safe. Many health clinics have just a few beds and even fewer ventilators.

Floyd Azure, chairman of the Assiniboine and Sioux tribes on Montana’s Fort Peck Reservation, said an influx of pipeline workers to northeastern Montana could accelerate the spread of the virus that has so far spared the reservation. He worries about a repeat of the problems that accompanied an oil boom in the region last decade — from drugs to sex trafficking — now exacerbated by the virus.

The pipeline would run just outside the reservation’s boundaries. Azure said he had no authority to stop the work and has been unable to convince state officials or federal lawmakers to intervene.

“We’re worried sick about it. We have enough problems on this reservation without someone creating more for us,” he said. “I don’t know and I don’t care where they’re from. I don’t think they should come here from somewhere else.”

___

Groves reported from Sioux Falls, South Dakota, and Attanasio reported from El Paso, Texas.

Matthew Brown, Stephen Groves And Cedar Attanasio, The Associated Press

Coronavirus

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

The COVID-19 outbreak at the two Coastal GasLink workforce lodges has officially been declared over. (Lakes District News file photo)
COVID-19 outbreak at Coastal GasLink worksites declared over

In total, 56 cases were associated with the outbreak in the Burns Lake and Nechako LHAs

The Nisga’a Valley Health Authority reported an isolated cluster of COVID-19 cases among non-direct care staff at the New Aiyansh Health Centre. (Gary Fiegehen/Nisga’a Lisims Government)
New Aiyansh Health Centre experiencing COVID-19 cluster among non-direct care staff

Nisga’a Valley Health Authority asking residents to cancel appointments outside the Nass Valley

A photo of the CervixCheck at-home test kit, developed by Eve Medical. (Submitted Photo/Katina Pollard, Métis Nation British Columbia)
Pilot project puts cancer screening into the hands of northwest B.C. women

Métis women experience barriers to cervical cancer screening

Brett Alexander Jones is wanted on several warrants province-wide, in connection with multiple charges. Jan. 21, 2021. Kitimat RCMP photo
Kitimat RCMP searching for man wanted on several warrants province-wide

Jones is described as a five-foot 10-inches Caucasian man, with blond hair and blue eyes.

The Nisga’a Lisims Government has extended its state of local emergency. (File photo)
Nisga’a state of local emergency extended, vaccines delayed

There are 21 active COVID-19 cases in the Nisga’a Valley Health Authority

Toronto Public Health nurse Lalaine Agarin sets up for mass vaccination clinic in Toronto, Jan. 17, 2021. B.C. is set to to begin its large-scale immunization program for the general public starting in April. THE CANADIAN PRESS/Frank Gunn
B.C.’s COVID-19 mass vaccinations expected to start in April

Clinics to immunize four million people by September

The District of Saanich’s communications team decided to take part in a viral trend on Thursday and photoshopped U.S. Senator Bernie Sanders into a staff meeting photo. (District of Saanich/Twitter)
Bernie Sanders makes guest appearance municipal staff meeting in B.C.

Vancouver Island firefighters jump on viral trend of photoshopped U.S. senator

School District 57 headquarters in Prince George. (Mark Nielsen, Local Journalism Initiative Reporter)
Prince George school district settles with sexual abuse victim

Terms were part of an out-of-court settlement reached with Michael Bruneau, nearly four years after he filed a lawsuit

Surrey provincial court. (File photo: Tom Zytaruk)
New COVID-19 protocols set for provincial courthouses

The new rules were issued on Jan. 21, and took effect immediately

Police in Vancouver looking for male suspect who allegedly spat and attacked a store manager for not wearing a mask, at 7-Eleven near Alma Street and West 10th Avenue just before noon on Dec. 17, 2020. (Vancouver police handout)
VIDEO: Man spits on 7-Eleven manager over mask rule, sparking Vancouver police probe

‘Unfortunately, the store manager sustained a cut to his head during the assault’

The Vancouver-based SAR team successfully rescued two lost snowshoers off of the west side of Tim Jones Peak in the early morning of Monday, Jan. 19. (North Shore Rescue photo)
B.C.’s busiest SAR team raises alarm after 2021 begins with fatality, multiple rescues

‘People beyond ski resort areas of Seymour, Grouse, and Cypress go without cell reception,’ SAR warns

Police are searching for an alleged sex offender, Nicole Edwards, who they say has not returned to her Vancouver halfway house. (Police handout)
Police hunt for woman charged in ‘horrific’ assault who failed to return to Surrey halfway house

Call 911 immediately if you see alleged sex offender Nicole Edwards, police say

A screenshot from a local Instagram account video. The account appeared to be frequented by Mission students, and showed violent videos of students assaulting and bullying other students.
Parents, former students describe ‘culture of bullying’ in Mission school district

Nearly two dozen voices come forward speaking of abuse haunting the hallways in Mission, B.C.

Joe Biden, then the U.S. vice-president, and Prime Minister Justin Trudeau take their seats at the start of the First Ministers and National Indigenous Leaders meeting in Ottawa, Friday, Dec. 9, 2016. THE CANADIAN PRESS/Adrian Wyld
Trudeau, Biden to talk today as death of Keystone XL reverberates in Canada

President Joe Biden opposed the Keystone XL expansion as vice-president under Barack Obama

Most Read