Right: Doug Donaldson, Minister of Forests, Lands and Natural Resource Operations and Rural Development and MLA for Stikine, celebrates the opening of the new Nass River Bridge. Joining Minister Donaldson is Joel Starland, Executive Director, Gitanyow Hereditary Chiefs and the project team from Metro Testing Operations, Saanburn Technical Services, Kingston Construction, Stantec Consulting and the Ministry of Transportation and Infrastructure. (MOTI Press Release Photo)

Construction of new Nass River Bridge officially completed on Hwy 37

Includes two lanes, a rest stop and viewing area of canyon

The new Nass River Bridge on Hwy 37, east of Stewart, is now officially open for traffic.

The Ministry of Transportation and Infrastructure (MOTI) announced the completion of the replacement project in a press release on Oct. 22.

“The new Nass River Bridge will better connect B.C.’s northern resource communities to the rest of the province,” said Doug Donaldson, Minister of Forests, Lands, Natural Resource Operations and Rural Development and MLA for Stikine, on behalf of Claire Trevena, Minister of Transportation and Infrastructure in the release.

“Forestry, mining and tourism are all important to the Northwest, and this two-lane upgrade to the Nass River crossing will support trade and economic growth in the region for years to come. It’s also a safer, modern piece of infrastructure that local and regional residents deserve.”

The total value of the project, which includes planning, design, engineering work and construction is $30.5 million. The Government of Canada contributed $10.6 million through the New Building Canada Fund, with B.C. covering the rest of the price tag. Construction began in the spring of 2018.

READ MORE: Hwy 37 cellular dead zone signage not their responsibility, province says

The new bridge replaces a single-lane bridge that was built in 1972, whereas its two lanes and wider shoulder are expected to improve safety for cyclists, pedestrians and all area residents. The wider span is also to accommodate larger vehicles used by industry in the area.

Crews also worked to realign a kilometer on each end of the bridge, which now permits a consistent 90 km/h speed limit along the corridor and improves sightlines for drivers to avoid collisions. The previous speed limit on the bridge was 30 km/h.

Included with the replacement is an improved rest stop with toilet facilities and a new lookout for viewing the Nass River Canyon.


 


natalia@terracestandard.com

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Coastal GasLink pipe continues to arrive in Terrace

Shipped by rail from Saskatchewan

No injuries reported following propane leak in Terrace

Hwy 16 closed off, businesses evacuated as emergency crews responded

Coastal GasLink stresses pipeline ‘on a schedule’ as B.C. appoints liaison for Wet’suwet’en

670-kilometre pipeline is schedule to be completed by end of 2023

River Kings dethrone Rampage to reclaim first place in CIHL standings

Terrace is heading to Rupert rivals Jan. 31 in what will be a pivotal match for first place

COLUMN | Creating a “community of practice” inspires

Art Matters by columnist Sarah Zimmerman

VIDEO: Feds look to help 126 Canadians quarantined in China for coronavirus

China has confirmed more than 4,500 cases of the new virus, with more than 100 deaths

Sap thief taps Saanich park maple trees, faces hefty fine

One tree found with four taps in Mount Doug Park

B.C. reports first coronavirus in Vancouver region

First patient visited Wuhan, China, reported symptoms

Uber threatens legal action to ‘defend its right’ to operate in Surrey

‘I have no concerns,’ Mayor Doug McCallum replies

Victoria resident says WestJet employee uttered racist comment, refused to let her on plane

Customer claims she was told ‘You guys can’t handle your alcohol’ by WestJet employee

Bystander who tried to help dog being attacked not liable for its death: B.C. tribunal

Owner of dog killed tried to get $5,000 in damages from man who tried to save it

INFOGRAPHIC: See how fast your B.C. city grew in 2019

The province’s fastest-growing municipalities were located on Vancouver Island

Landowner hearings begin for Trans Mountain expansion in Alberta

Detailed route talks start in Spruce Grove, in B.C. communities soon

Alessia Cara to host and perform at 2020 Juno Awards

Multi-platinum Canadian singer-songwriter also up for six awards, including Artist of the Year

Most Read