Right: Doug Donaldson, Minister of Forests, Lands and Natural Resource Operations and Rural Development and MLA for Stikine, celebrates the opening of the new Nass River Bridge. Joining Minister Donaldson is Joel Starland, Executive Director, Gitanyow Hereditary Chiefs and the project team from Metro Testing Operations, Saanburn Technical Services, Kingston Construction, Stantec Consulting and the Ministry of Transportation and Infrastructure. (MOTI Press Release Photo)

Construction of new Nass River Bridge officially completed on Hwy 37

Includes two lanes, a rest stop and viewing area of canyon

The new Nass River Bridge on Hwy 37, east of Stewart, is now officially open for traffic.

The Ministry of Transportation and Infrastructure (MOTI) announced the completion of the replacement project in a press release on Oct. 22.

“The new Nass River Bridge will better connect B.C.’s northern resource communities to the rest of the province,” said Doug Donaldson, Minister of Forests, Lands, Natural Resource Operations and Rural Development and MLA for Stikine, on behalf of Claire Trevena, Minister of Transportation and Infrastructure in the release.

“Forestry, mining and tourism are all important to the Northwest, and this two-lane upgrade to the Nass River crossing will support trade and economic growth in the region for years to come. It’s also a safer, modern piece of infrastructure that local and regional residents deserve.”

The total value of the project, which includes planning, design, engineering work and construction is $30.5 million. The Government of Canada contributed $10.6 million through the New Building Canada Fund, with B.C. covering the rest of the price tag. Construction began in the spring of 2018.

READ MORE: Hwy 37 cellular dead zone signage not their responsibility, province says

The new bridge replaces a single-lane bridge that was built in 1972, whereas its two lanes and wider shoulder are expected to improve safety for cyclists, pedestrians and all area residents. The wider span is also to accommodate larger vehicles used by industry in the area.

Crews also worked to realign a kilometer on each end of the bridge, which now permits a consistent 90 km/h speed limit along the corridor and improves sightlines for drivers to avoid collisions. The previous speed limit on the bridge was 30 km/h.

Included with the replacement is an improved rest stop with toilet facilities and a new lookout for viewing the Nass River Canyon.


 


natalia@terracestandard.com

Like us on Facebook and follow us on Twitter

Just Posted

River Kings take control of Steelheads in 9-6 win

The boys get another chance against Terrace when they play there on Nov. 23

Hazelton aces their way to gold at Grade 8 girls volleyball zones

Smithers schools grab silver and bronze at Prince Rupert Middle School tournament

William Griffin arrested in Houston homicide

RCMP have now arrested William Griffin, the man wanted in connection to… Continue reading

UNBC faculty strike enters second week in Terrace

Students, BC Nurses Union, and MP Taylor Bachrach visited picketing lines Friday

Family of Terrace man killed in hit-and-run plead for tips, one year later

Cameron Kerr’s family says the driver and passengers tried to cover their tracks

Cold, stormy winter forecast across much of Canada, The Weather Network predicts

In British Columbia temperatures will be slightly above normal and precipitation will be just below normal

UPDATED: Vancouver Island’s Joe gets suspended sentence in Teddy the dog cruelty case

Melissa Tooshley expected in court on Thursday in same case

Nineteen boats carrying invasive mussels stopped at B.C. borders

Waters of Columbia-Shuswap still test mussel-free

Woman ‘horrified’ after being told to trek 200 kilometres home from Kamloops hospital

‘I can’t get from Kamloops back to 100 Mile House injured, confused… no shoes, no clothes whatsoever’

Canadian universities encourage exchange students in Hong Kong to head home

UBC said 11 of its 32 students completing programs in Hong Kong have already left

Midget no more: Sweeping division name changes coming to minor hockey in Canada

Alpha-numeric division names will be used for the 2020-2021 season and beyond

Duncan man gets suspended sentence in Teddy the dog cruelty trial

Joe also gets lifetime ban on owning animals

B.C. pushes for greater industry ‘transparency’ in gasoline pricing

Legislation responds to fuel price gap of up to 13 cents

B.C. woman ordered to return dog to ex-boyfriend for $2,000

After the two broke up, documents state, they agree to share custody of the dog, named Harlen

Most Read