The new $1.3 million health and wellness centre will be adjacent to the Waap Amgam (House of Cedar) along the north side of the building where the squash courts were located. (Quinn Bender Photo)

CMTN unveils plans for $1.3 million health and wellness centre

The renovated facility inside the trades building will be open for students and residents

Coast Mountain College is moving forward on plans for a $1.3 million health and wellness building on their Terrace campus.

The 2,877 sq. ft centre is a renovation of the existing fitness facility attached to the Waap Amgam (House of Cedar) trades building, and is aimed to be a “vital hub for on-campus wellness activities.”

“The College anticipates that upon its completion, this wellness center will complete a strategy to develop a campus community that offers a variety of activity and recreation options for our students, staff and the citizens of Terrace and the surrounding area,” reads a summary of the project presented to city council Jan. 14.

READ MORE: CMTN unveils renovated House of Cedar

Preliminary floor plans show a large open concept space with cardio machines and weights, similar to what was available before the trades building was renovated. There will also be a separate studio room for group activities like yoga, aerobics, Zumba and spin classes.

“We know that fit, healthy students are better positioned for success at school. We also know that student life on campus is important to building community and providing students with on-campus activities – the fitness centre will help with that,” wrote CMTN’s director of communications and public relations Sarah Zimmerman in an email to the Terrace Standard.

“This is an important piece of infrastructure for our students, staff and community members in the area. Our students have identified a fitness facility as being important to them.”

CMTN has hired Stantec to be the architect for the project and IDL Construction Management Group to develop the initial designs. The college has also hired on a design consultant to assess accessibility features for the centre.

READ MORE: Massive college rebuild planned in Terrace, B.C.

To fund the project, CTMN has created a multi-year internal funding source of $950,000 and is applying for $250,000 in funding from the Northern Development Initiative Trust.

The foundation for the new building has been completed so far, with the construction of the centre’s superstructure beginning this year. The college expects the total fit-out to be done by the end of May to unveil the new health and wellness centre by early summer.


 


brittany@terracestandard.com

Like us on Facebook and follow us on Twitter

Just Posted

Sixth annual Easter Egg Hunt returns to Terrace

Approximately 13,000 chocolate eggs were handed out

Cedar tree planted in Terrace in honour of Indigenous reconciliation

A tree planting ceremony was held in George Little Park April 20 to kickstart conversation

Housing affordability in Northern B.C. sees slight improvements: report

Higher paying jobs mitigating effects of increased housing prices, Realtor says

Students from Caledonia Secondary School ran marathon in Hawaii

Six athletes placed Top 3 in their category

Repen: FOI data proves Telkwans being ripped off by ICBC

Former Telkwa mayor received a response from ICBC and says the results don’t look good for residents

Homeless activists outside Notre Dame demand ‘a roof too’

Wealthy people have donated millions to effort to rebuild cathedral after devastating fire

B.C. VIEWS: NDP’s lawyer show is turning into a horror movie

Court actions pile up over pipelines, car insurance, care aides

PHOTOS: Green Party Leader Elizabeth May says ‘I do’ on Earth Day

May and John Kidder got married Monday morning in Victoria

Fire forces 36 people at Vanderhoof care home to evacuate

No one was hurt after the fire at Stuart Nechako Manor

Sri Lanka invokes war-time military powers after nearly 300 killed in Easter bombings

Sri Lanka’s minister of tourism says 39 foreign tourists were killed in the Easter Sunday attacks

B.C. Interior yoga studio raises $2,500 for woman leaving abusive relationship

The 100 Mile House studio held a fundraiser yoga class and accepted donations from members to help the woman

Deadly synthetic drug found in Kamloops that puts users in ‘zombielike’ state

Interior Health warning says substance causes ‘speedy, trippy-like symptoms’ and hallucinations

Trudeau to be portrayed on ‘Simpsons’ episode

Toronto journalist who’s posted videos of himself doing impressions of the PM voiced him for the show

Elizabeth May’s wedding dress a ‘walk through a garden’ on Earth Day

Green Party leader set to get married in Victoria

Most Read